            轻质隔墙板安装注意事项

            作者:匿名    访问量:2055    发布时间:2013/9/3

            轻质隔墙板安装注意事项: 

                1 安水暖、煤气管道卡:按水暖、煤气管道安装图找准标高和竖向位置,划出管卡定位线,在隔墙板上钻孔扩孔(禁止剔凿),将孔内清理干净,先刷SG791胶液一道,再用SG791胶泥固定管卡。

                2 清理隔墙板与顶面、地面、墙面的结合部,凡凸出墙面的砂浆、混凝土块等必须剔除并扫净,结合部尽力找平。 

                3 放线、分档;在地面、墙面及顶面根据设计位置,弹好隔墙边线及门窗洞边线,并按板定分档。
                4 配板、修补:板的长度应按接面结构层净高尺寸减2030mm。计算并量测门窗洞口上部及窗口下部的隔板尺寸,并按此尺寸配板。当板的宽度与隔墙的长度不相适应时,应将部分隔墙板预先拼接加宽(或锯窄)成合适的宽度,并放置在阴角处。有缺陷的板应修补。
               5 有抗震要求时,应按设计要求用U形钢板卡固定条板的顶端。在两块条板顶端拼缝之间用射钉将U形钢板卡固定在梁或板上,随安板随固定U形钢板卡。
                6 配制胶粘剂:将SG791胶与建筑石膏粉配制成胶泥,石膏粉∶SG791=10.6 0.7(重量比)。胶粘剂的配制量以一次不超过20min使用时间为宜。配制的胶粘剂超过30min凝固了的,不得再加水加胶重新调制使用,以避免板缝因粘接不牢而出现裂缝。
                7 安装隔墙板:隔墙板机安装顺序应从与墙的结合处或门洞边开始,依次顺序安装。板侧清刷浮灰,在墙面、顶面、板的顶面及侧面(相拼合面)先刷SG791胶液一道,再满刮SG791胶泥,按弹线位置安装就位,用木楔顶在板底,再用手平推隔板,使之板缝冒浆,一个人用特制的撬根在板底部向上项,另一人打木楔,使隔墙板挤紧须实,然后墙板机用开刀(腻子刀)将挤出的胶粘剂刮平。按以上操作办法依次安装隔墙板。
                在安装隔墙板时,一定要注意使条板对准预先在顶板和地板上弹好的定位线,并在安装过程中随时用2m靠尺及塞尺测量墙面的平整度,用2m托线板检查板的垂直度。
                粘结完毕的墙体,应在24h以后用C20干硬性细石混凝土将板下口堵严,当混凝土强度达到10MPa以上,撤去板下木楔,并用同等强度的干硬性砂浆灌实。
                8 铺设电线管、稳接线盒:按电气安装图找准位置划出定位线,铺设电线管、稳接线盒。
                所有电线管必须顺轻质墙板机墙板孔铺设,严禁横铺和斜铺。
                稳接线盒,先在板面钻孔扩孔(防止猛击),再用扁铲扩孔,孔要大小适度,要方正。孔内清理干净,先刷SG791胶液一道,再用SG791胶泥稳住接线盒。
             
            我公司专业生产销售墙板机钢棉机 本文由www.blogkoukoku.com提供

            Lightweight partition board installation considerations:
            1, plumbing, gas piping card: according to the plumbing, gas piping installation drawing for level and vertical position, draw pipe clamp positioning line, hole reaming on clapboard (stuck between ban chisel), clean up the hole, the first brush SG791 adhesive solution, reoccupy SG791 cement pipe clamp.
            2 clean partition board and the top surface, ground, metope, all out of metope mortar, concrete block and so on must remove and sweep, integration of try to leveling.
            3 pay-off, step; On the ground, metope and end face according to the designed position, play good partition door humanly scaled the line edges, and press plate fixed step.
            The length of the 4 distribution board, repair: board should be according to the size of junction structure layer clear height of minus 20 ~ 30 mm. Calculate and measure the upper Windows and doors hole and a baffle plate at the bottom of the window size, and according to the size of the plate. When the plate width and the length of the partition does not adapt, should be part of the partition board splicing widened in advance (or saw a narrow) into the appropriate width, and placed in the shade. The defective board should be repaired.
            5 seismic requirements, should according to the design requirements with u-shaped plate fixed bar at the top of the card. At the top of the two pieces of bar flat-fell seam between the u-shaped steel card with nail fixed on the beam or plate, with Ann plate with fixed u-shaped steel card.
            6: dispensing adhesive will SG791 glue mixture cement and building gypsum powder, gypsum powder: SG791 = 1:0.6 ~ 0.7 (weight ratio). The preparation of the adhesive amount to a less than 20 min it is advisable to use time. The preparation of the adhesive for more than 30 min solidification, shall not be used to add water to add glue to modulation, in order to avoid plate seam cracks due to glue rickety.
            7 installation partition panel: partition plate installation sequence should be started, and the junction of the wall or door installed in turn order. Board side flush float ash, in metope, end face, the top surface of plate and the side split surface (phase) brush SG791 first adhesive solution to full blown SG791 daub again, according to the elastic line installed in place, at the bottom of the plate with a wooden wedge, reoccupy hand horizontal pushing plate, the plate seam risked pulp, a person with special pry up the bottom of the plate, the other people dozen chock, make the partition board clamping must be real, then the wall plate with operation (putty knife) adhesives leveling out. According to the above operation way to install the partition board in turn.
            When installing a partition wall board, it is important to note that the plate alignment play good positioning line on the roof and floor in advance, and in 2 m at any time during the installation process by feet and feeler the flatness of metope, in 2 m line plate inspection of verticality.
            Binding end wall, should be within 24 h after using C20 harsh under the plate mouth of fine stone concrete wall, when the strength of concrete reaches more than 10 mpa, wedge removed board, with the same intensity of harsh mortar pouring.
            8 laid wire tube, unsteady junction box: according to the electrical installation drawing for position row positioning line, pipe laying wire, junction box.
            All wire and tube must be suitable light wall plate wall hole laid, it is forbidden to horizontal and inclined shop.
            Junction box, first in the borehole reaming (prevent slam), reoccupy reaming with flat, hole size moderate, founder. Hole is clean, brush SG791 first adhesive solution, reoccupy SG791 cement stabilize junction box.
            I company specializing in the production and sales of plate wall, the steel wool, this paper provided by www.blogkoukoku.com
            网站首页 | 公司简介 | 新品推荐 | 产品展示 | 新闻中心 | 人才招聘 | 信息反馈 | 联系我们 | 友情链接

            抗震支架 LED显示屏 智慧灯杆 卧式球磨机 粉末冶金 金卡纸 模袋 刮泥机 异型钢管 直读光谱仪 空调风机 清洗机 尾矿 活塞环 麻辣海鲜 高效过滤器 液压系统 搅拌球磨机 端面铣床

            版权所有:无锡市华通液压气动制造有限公司   无锡网站建设:无锡速联科技
            友情链接: 伺服油缸  电机换热器  太阳能污水处理设备 一体化预制泵站

            h无码精品动漫在线观看免费_西西人体大胆444www_国产成人凹凸视频在线观看_被下春药爽到高潮的视频